MEXICO

TIERRA MOJADA

Tierra Mojada is a combined-cycle power plant with an installed capacity of 874 MW. It operates in a 2x1 configuration (two gas turbines and one steam turbine) featuring General Electric H-class technology (GE 7HA.02), renowned for achieving thermal efficiencies exceeding 60%.

SALAMANCA

The CFE Salamanca Combined Cycle Power Plant has an installed capacity of 927.1 MW, operating under a 2x1 multi-shaft configuration (two gas turbines and one steam turbine).

RACK DE PEMEX

This steel megastructure serves as the logistical backbone of the Olmeca Refinery, interconnecting the 17 process units with the storage area and offsite utilities.

CC SAN JUANDE POTOSÍ

Located in the municipality of Villa de Reyes, this Comisión Federal de Electricidad (CFE) plant leverages the infrastructure of the former thermoelectric power station to integrate state-of-the-art technology with an installed capacity of approximately 450 MW.

CC SALAMANCA

The Salamanca Combined Cycle Power Plant, operated by the Comisión Federal de Electricidad (CFE), marks a milestone in Mexico’s energy modernization, positioning itself as one of the most efficient facilities in Latin America. With an installed capacity of 927.1 MW, this state-of-the-art facility utilizes natural...

CC EL SAÚZ

This facility is a cornerstone for the industrial development of the Mexican Bajío region. With an installed capacity of approximately 600 MW following its recent modernization and repowering projects, the plant converts natural gas into high-efficiency electrical energy.