admin2026-05-08T16:58:59+00:00Located on the right bank of the Ebro River, in Tarragona, this facility operates under a two-twin-unit scheme with Pressurized Water Reactors (PWR) designed by Westinghouse. Unit I features a gross electrical output of 1,032.5 MW, while Unit II reaches 1,027.2 MW, totaling a combined...