admin2026-05-08T17:34:12+00:00"With an installed capacity of approximately 800 MW, this mixed infrastructure integrates two combined cycle units that currently run on gas oil, although they have been designed for a future transition to natural gas. Its operation is essential for ensuring the stability of the island's...