admin2026-05-11T06:46:24+00:00The transformation of the Aceca Power Plant into a state-of-the-art combined cycle facility was the result of a strategic alliance between Sener and Cobra. This Joint Venture (JV) led a complex engineering and construction project under a turnkey (EPC) contract, successfully integrating two 400 MW...