CEPSA TENERIFE
Commissioned in 1930, this complex holds the title of being the first refinery built in Spain and served as the primary energy driver for the Canary Islands for decades. Strategically located on the coast of Tenerife's capital, the facility ceased its refining operations in 2013....
23Mar
CEPSA SAN ROQUE
This industrial complex spans approximately 150 hectares in the municipality of San Roque (Cádiz), forming the core of the Bay of Algeciras Chemical Hub. Its location is key due to its proximity to the Port of Algeciras, facilitating the berthing of large crude oil tankers...
20Mar
CEPSA LA RÁBIDA
The La Rábida Refinery, operated by Cepsa within the Huelva Chemical Hub, is one of the most advanced and efficient energy centers in Europe. With a distillation capacity exceeding 9.5 million tonnes of crude oil per year, this facility stands out for its high technological...
20Mar
CEPSA QUÍMICA
Cepsa Química consolidates its position as a global leader in the manufacturing of essential raw materials, standing out as the world’s largest producer of LAB (Linear Alkyl Benzene)—the base for biodegradable detergents—and cumene
20Mar
CC TARRAGONA
The Tarragona Combined Cycle Power Plant is a fundamental energy pillar for the Tarragona petrochemical complex, one of the most significant in Southern Europe. With an installed capacity of approximately 425 MW, this facility operated by Iberdrola stands out for its high efficiency, converting natural...
20Mar
CC SON REUS II
The Son Reus II Combined Cycle Power Plant, operated by Endesa, is a vital infrastructure for the Balearic Islands' power system, located in the municipality of Palma. With an installed capacity of approximately 225 MW, this facility utilizes natural gas as its primary fuel, enabling...
20Mar
CC LA PLANA DEL VENT
The La Plana del Vent Combined Cycle Power Plant, owned by Naturgy, is one of the most powerful and efficient power generation facilities in Catalonia. With an installed capacity of approximately 800 MW (divided into two 400 MW units), this plant utilizes natural gas to...
20Mar
CC GRANADILLA
"With an installed capacity of approximately 800 MW, this mixed infrastructure integrates two combined cycle units that currently run on gas oil, although they have been designed for a future transition to natural gas. Its operation is essential for ensuring the stability of the island's...
20Mar